Extension Line D Tram Bordeaux | France

The Bordeaux tramway was the first French tram system equipped with a Frauscher axle counting system, benefitting from the innovative management methods like Counting Head Control.

The D line of the Bordeaux tramway is a tram line which is around 10 kilometres long. A significant challenge of D line is both the availability and reliability of the signals that allow rolling stock to move without incident.

The implementation of the Frauscher Advanced Counter FAdC and Frauscher Wheel Sensor RSR180 support the innovative concept of Counting Head Control. The patented management method can be implemented without additional hardware and compensates counting errors which are common in urban areas.

Innovative management methods

Counting Head Control CHC is a patented concept by Frauscher which supports the availability of operations.

Patented rail claw

The Frauscher Rail Claw SK420 perfectly fits for grooved rails and has been developed especially for this field.

Project details
Operator
Keolis
Country or region
France
Partner
Vossloh-Cogifer
Segment
Tram & Metro
Axle Counting
Frauscher Advanced Counter FAdC
Wheel Detection
RSR180
Application
Track vacancy detection
Counting Head
13
Similar projects

This might also interest you

Frauscher Train Detection Metro Warsaw

Metro Warsaw | Poland

Metro Warsaw was looking for an alternative to track circuits for the line M2, to increase the availability of public transport by using reliable signalling technology. In the end, the operator even decided to replace the existing track circuits on line M1 with the Frauscher Axle Counter ACS200.

Dillinger Hütte | Germany

A new ladder track was required to provide more parking tracks in the steel plant. At the same time, the layout of the dead end tracks were optimised and the efficiency of the whole depot improved by installing the Frauscher Advanced Counter FAdCi in combination with the wheel sensor RSR180. With the implementation of the Frauscher Diagnostic System FDS, the overall maintenance costs can be significantly reduced.

Edmonton Metro Line | Canada

The Edmonton Metro Line was experiencing significant issues with its newly installed Communications Based Train Control (CBTC) signalling system, which did not perform to the operator‘s expectations. The city was forced to run an incomplete schedule with reduced train speed and frequency which negatively affected commuters and the city of Edmonton in general. Finally in 2019, the operator decided to install a new system in cooperation with Frauscher.